Zaino: Avg Time
#2
For a full detail that includes:
Wash, dry, clay, polish with PC, Z5 pro x2, ZCS with final Z6 wipedown....about 6 hours. Honestly, the polishing and letting the Zaino dry is what takes the bulk of the time for me.
Wash, dry, clay, polish with PC, Z5 pro x2, ZCS with final Z6 wipedown....about 6 hours. Honestly, the polishing and letting the Zaino dry is what takes the bulk of the time for me.
#3
Cruiser
Thread Starter
Originally Posted by Yakuza70
For a full detail that includes:
Wash, dry, clay, polish with PC, Z5 pro x2, ZCS with final Z6 wipedown....about 6 hours. Honestly, the polishing and letting the Zaino dry is what takes the bulk of the time for me.
Wash, dry, clay, polish with PC, Z5 pro x2, ZCS with final Z6 wipedown....about 6 hours. Honestly, the polishing and letting the Zaino dry is what takes the bulk of the time for me.
#4
Senior Moderator
for me it took about a day, the time is mostly letting the wax dry and set, but i had to wait a while since its pretty humid in Florida. I did about 5 coats of z5, z coats of z2 with coats of z6 in between and it has lasted me over a year so far. All I do now is hose it off with water and air dry it with a leaf blower and is still has its orignal shine, gloss and ability to sheet/bead up water.
#6
Originally Posted by antlive
wow, six hours is a long time to detail. how often do you you do this process?
Thread
Thread Starter
Forum
Replies
Last Post
Skirmich
2G TL (1999-2003)
37
09-15-2015 06:41 PM