Also In This Album

My Post Pictures (25) »
Acura TL Builder July 3, 2018
Still A lot of work ahead. S/C needs to be removed. Alternator pulley bracket needs to be installed. Need to shave down the rest of the starter terminal bolt and solder the wire to the flat metal. Need to heavily insulate the starter bolt so that the electricity does not arc onto the S/C. Need to drain and fill the radiator again. Move the power steering pulley hose away from S/C pulley. Reinstall all components and upload the DomGSR’s Hondata S/C map. Ignition and testing begins!

More About This Picture

Vehicle

N/A

Location

N/A

Keywords

N/A

Discover More Pictures

See More
Advertisement

Comments (0)

Please Register or log in to leave a comment.

Be the first to comment on this picture!